Libya 160 wood-plastic grille panel great wall pvc panels producers

Libya 160 wood-plastic grille panel great wall pvc panels producers,Libya 160 wood-plastic grille panel great wall pvc panels producers

When the initial preparation work of the wall is completed, the wall is positioned with ink lines, the board is arranged according to the interface and fixed with bolt, the base of the wooden structure is fixed with code nails, the cement steel row nails are used for the low hardness cement wall, and the expansion bolts are used for the high hardness cement wall. After the ceiling measurement is completed, the ceiling elevation horizontal line is set, and then the installation of keel and auxiliary keel is completed. After the pipeline is laid, the molding panel is installed, and the installation of integrated wallboard can be started after the setting line of the bomb.


When installing the line, use non-nail glue and nail to fix the back of the line to do hair pulling treatment, and remove the ash dust to increase the adhesive surface of the glue. The installation of the shadow corner line is similar to that of the ordinary line, but if the surface texture of the line is simple and difficult to cover the nail marks, the use of quick-drying nail free adhesive is fixed to ensure the beauty of the shadow corner line. The Yang Angle is used to cover the gap.

Similar Posts